This meant a myriad of logistics had to be organized. The pool equipment and services all had to go “through” what was built. We used an existing dry river bed, originally created to replace a necessary apron swale, to run pool plumbing and other services, so as not to disturb the already established planting. Steel plates were put down to bring machinery over the stone driveway and walkways to ensure stability. The entire one side of the landscaped area was removed and stored on the driveway, road and side yard (holding garden). After the new pool was installed, it all went back in with minor changes.